| Unit Cost Element | Unit Cost Component | Description | Location | Cost Type | Data Date | Reported Units | Units | Year (Dollars) | Capital Cost Per Unit | O& M Cost Per Unit | Lifetime (Years) | View Details |
| Basic Facilities, Comm. for Large Area - TM | Basic Facilities, Comm for Large Area | Cost based on physical building cost/ comm infrastructure. This is based on the 12,000 sq.ft. building for Artemis Control Center in Cincinnati. Includes all costs from ground-breaking to ribbon-cutting. Miami also has a 12,000 sq.ft. building that was remodeled for Florida DOT. | Miami, Florida, USA | Actual | 2001 | | Lump Sum (LS) | 2001 | $12,000,000.00 | $60,000.00 | 20 | View Details |
| Basic Facilities, Comm. for Large Area - TM | SMART SunGuide TMC | SMART SunGuide TMC | Fort Lauderdale, Florida, USA | Estimated | 2005 |  | Per Year | 2005 |  | $1,964,089.00 |  | View Details |
| Basic Facilities, Comm. for Large Area - TM | SMART SunGuide TMC | SMART SunGuide TMC | Fort Lauderdale, Florida, USA | | 2006 | | Per Year | 2006 | | $2,112,820.00 | | View Details |
| Basic Facilities, Comm. for Large Area - TM | TMC - Basic Facilities, Comm. | O&M = Operation Costs – The RTMC is to handle the CCTV, DMS, and detour control. building ommunications, software, hardware, labor, and integration. | Florida, USA | Actual | 2003 |  | Location | 2003 | $3,998,495.00 | $300,000.00 | 15 | View Details |
| Basic Facilities, Comm. for Large Area - TM | TMC - Basic Facilities, Comm. | LOW 0&M DISTRCT 2 DATA. power back-up systems, utility costs, telephone line costs, and daily operational costs. The low value is based on District 2 data. The high value is based on District 6 data. | Florida, USA | | 2003 | | Location | 2003 | | $100,000.00 | | View Details |
| Basic Facilities, Comm. for Large Area - TM | TMC - Basic Facilities, Comm. | HIGH O&M DISTRICT 6 DATA. power back-up systems, utility costs, telephone line costs, and daily operational costs. The low value is based on District 2 data. The high value is based on District 6 data. | Florida, USA |  | 2003 |  | Location | 2003 |  | $500,000.00 |  | View Details |
| Basic Facilities, Comm. for Large Area - TM | TMC - Basic Facilities, Comm. | $181 per square foot (ft2) [$181 per 0.0929 square meters (m2)] – The costs presented are based on the ITS Package C equipment deployment, including a 32,000 ft2 [2973 m2] SunGuideSM transportation management center (TMC). | Florida, USA | Actual | 2003 | | Location | 2003 | $5,792,000.00 | $236,430.00 | 20 | View Details |
| Basic Facilities, Comm. for Large Area - TM | TMC - Basic Facilities, Comm. | $220/ft2 [$220/.0929 m2] – a two-story facility and includes District 7’s TMC and the Florida Highway Patrol (FHP) Troop C dispatch center. | Florida, USA | Actual | 2003 |  | Location | 2003 | $4,285,600.00 |  | 60 | View Details |