Unit Cost Entry

Unit Cost Element - Roadside Signal Preemption/Priority

Unit Cost Component - Transit signal priority hardware


United States


Description

Transit signal priority (TSP) hardware at intersection (receivers, phase selector, control box, and controller).

Cost Type

Estimated

Data Date

2009

Reported Units



Units

Intersection

Year (Dollars)

2009

Capital Cost per Unit ($)

$10,900.00

O & M Cost per Unit ($)

$435.00

Lifetime

years


Notes

Capital cost components: Receivers $1000; Phase selector $1,800; Control box and controller $8,000 per intersection.

Annual O&M cost components: Receivers $40; Phase selector $75; Control box and controller $320 per intersection.

Source

Characteristics of Bus Rapid Transit for Decision-Making (CBRT) 2009 Update

Author: Diaz, Roderick B. and Dennis Hinebaugh (National Bus Rapid Transit Institute)

Published By: U.S. DOT Federal Transit Administration

Other Reference Number: Report No. FTA-FL-26-7109.2009.1

URL: http://www.fta.dot.gov/do
cuments/CBRT_2009_Update.
pdf
Related System Cost ID: 2012-00264

Unit Cost Details

Capital Cost per Unit: $10,900.00

O&M Cost per Unit: $435.00

Year (Dollars): 2009

Lifetime: years


Related Unit Cost Subsystems

Roadside Control (RS-C)

Keywords

bus priority, traffic signals, TSP

ID: 2012-02368