Unit Costs (Adjusted)

Equipment Costs for Roadside Rail Crossing (R-RC)

Note: Equipment list adjusted to 2014 dollars. The date in parentheses under the capital cost value and O&M cost value represents the dollar year from which the cost value was adjusted. All costs are in $K.
Unit Cost Element IDAS # Life
Years
Capital Cost
$K, 2014 Dollars
(Source Year)
O&M Cost
$K/year, Dollars
(Source Year)
Description
Rail Crossing 4-Quad Gate, Signals
Index: 2
RS0212069 - 79
(1995)
2.6 - 2.9
(1995)
Gates and signals.
Rail Crossing Train Detector
Index: 2
RS0222010 - 13
(1995)
0.5 - 0.62
(1995)
Train detector circuitry and communication line from intelligent interface controller (IIC) to wayside interface equipment (WIE). Assume two track crossing with two 0.5 mile communication lines.
Rail Crossing Controller
Index: 2
RS023105 - 6
(1995)
0.2 - 0.3
(1995)
Intelligent interface controller (IIC).
Rail Crossing Pedestrian Warning Signal, Gates
Index: 2
RS024206 - 9
(1995)
0.1 - 0.2
(1995)
Pedestrian warning signal and gates.
Rail Crossing Trapped Vehicle Detector
Index: 2
RS0251015 - 18
(1995)
1.0 - 0.9
(1995)
Entrapped vehicle detection camera, with poles and controller.
Other Unit Cost Elements
Index: -
----Summary values under development