<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet title="XSL_formatting" type="text/xsl" href="RSSStyle.xslt"?>
<!--
Because the latest browser versions override styling I have to place a comment in this feed that is at least 512 bytes long in order for the feed to display the way I want it to display.  I realize that some
browsers will override this style sheet with one of their own, but for those that don't, we are trying to
make the subscription process as easy as possible with the helper fields and instruction text.
-->
<rss version="2.0">
<channel>
<title>System Validation</title>
<description>ITS Systems Engineering process: the system owner/operator runs its own set of tests to make sure the deployed system meets the original needs identified in the Concept of Operations</description>
<link>http://www.itslessons.its.dot.gov/its/benecost.nsf/DisplayLessonSystemsEng?OpenForm&amp;System%20Validation</link>
<key><![CDATA[http://www.benefitcost.its.dot.gov/its/rssNewsFeed.nsf/RSSFeed?ReadForm&System%20Validation]]></key>
<item><title>ITS Lessons >> Consider user acceptance of driver fatigue detection systems to be dependent on ease of use, ease of learning, perceived value, driver behavior, and advocacy. </title><description><![CDATA[An Evaluation of Emerging Driver Fatigue Detection Measures and Technologies (6/2009)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>01/31/2013 09:50:05 AM</pubDate><link>http://www.itslessons.its.dot.gov/ITS/benecost.nsf/ID/C1D05C29CCBA8C2385257AFB0053600E?OpenDocument&amp;Query=Home</link></item><item><title>ITS Lessons >> Allow one agency to be in charge of the procurement process when implementing ITS technologies designed to coordinate services between urban and rural transit systems.</title><description><![CDATA[Central Florida Regional Transportation Authority d.b.a. LYNX & Polk County Transit Services (PCTS) Rural Intelligent Transportation System Demonstration Project  (December 2010)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>12/31/2012 10:51:11 AM</pubDate><link>http://www.itslessons.its.dot.gov/ITS/benecost.nsf/ID/1972F1F2444C414285257998004E5B1B?OpenDocument&amp;Query=Home</link></item><item><title>ITS Lessons >> Ensure proper placement of variable speed limit (VSL) signs in a work zone and operate the VSL system consistently on a long term basis.</title><description><![CDATA[Work Zone Variable Speed Limit Systems: Effectiveness and System Design Issues (03/01/2010)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>11/16/2011 12:51:37 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/ID/90B73D4F926CE2F08525793D0012224A?OpenDocument&amp;Query=Home</link></item><item><title>ITS Lessons >> Develop an effective evacuation plan for special event that gathers a large audience and consider co-locating the responding agencies in a joint command center.</title><description><![CDATA[iFlorida Model Deployment Final Evaluation Report (01/30/2009)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>12/17/2009 07:42:39 AM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;C144C7CFCF28E1838525768C0072F17B^Home</link></item><item><title>ITS Lessons >> Use Analysis, Modeling, and Simulation (AMS) to identify gaps, determine constraints, and invest in the best combination of Integrated Corridor Management (ICM) strategies.</title><description><![CDATA[Integrated Corridor Management: Analysis, Modeling, and Simulation Results for the Test Corridor (September 2008)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>12/11/2009 12:20:18 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;43CAB9C9CAF3435B8525767800548502^Home</link></item><item><title>ITS Lessons >> Adopt a performance-based, proactive approach to traffic signal system operations in order to maximize operational efficiency.</title><description><![CDATA[Assessment of City of Minneapolis Traffic Signal Management and Operations Program (February, 2004)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>01/04/2008 02:13:58 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;20EB0E41225611D7852573A60063EEEA^Home</link></item><item><title>ITS Lessons >> Optimize travel time messaging operations by improving the way in which data is collected, analyzed, and displayed. </title><description><![CDATA[Travel Time Messaging on Dynamic Message Signs – Chicago, IL; Houston, TX, Nashville, TN, and Portland, OR (May, 2005)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>10/31/2007 01:41:49 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;775FC20E101EBE94852573780068EC4B^Home</link></item><item><title>ITS Lessons >> Perform System Monitoring of 511 Systems.</title><description><![CDATA[America's Travel Information Number:  Implementation and Operational Guidelines for 511 Services Version 3.0 (September 2005)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>07/12/2007 04:18:59 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;6795105CE8CE1680852572F7004D01D0^Home</link></item><item><title>ITS Lessons >> Test new signal timing plans, even on a shoestring budget.</title><description><![CDATA[Signal Timing on a Shoestring (July 2005)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>07/12/2007 04:18:46 PM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;2B5E1FCE9764E86D852572F7004BDECD^Home</link></item><item><title>ITS Lessons >> Evaluate and upgrade TOC maintenance programs on an on-going basis. </title><description><![CDATA[Intelligent Transportation Systems (ITS) - Operational Support Contracts - Implementation Plan - Final Report (January, 2005)          ITS Lessons Learned Knowledge Resource     http://www.itslessons.its.dot.gov]]></description><pubDate>03/05/2007 10:17:41 AM</pubDate><link>http://www.itslessons.its.dot.gov/its/benecost.nsf/Lesson?OpenForm&amp;A9A22694DF257AEE852572890055E0DE^Home</link></item></channel>
</rss>
