Cost estimates of operational concepts for converting HOV lanes to managed lanes on I-75/I-575 in Georgia range from $20.9 million to $23.7 million.(April 2006)
In Georgia, the cost to install 147 cellular/solar powered call boxes, connect them to an emergency call center, and provide agency training was estimated at $911,873.(May 2000)