Sample Unit Cost Entries (58 unique unit cost entries found)

Unit Cost Entries for Transit Management Center (TR)

Unit Cost ElementUnit Cost ComponentDescriptionLocationCost TypeData DateReported UnitsUnitsYear (Dollars)Capital Cost Per UnitO& M Cost Per UnitLifetime (Years)View Details
Basic Facilities, Comm. for Large Area - TRBasic Facilities for Large AreaTransit management facility. Based on purchase of building rather than leasing space.Tampa, Florida, USAEstimated2006Lump Sum (LS)2006$300,000.0020View Details
Basic Facilities, Comm. for Medium Area - TRBTC Radio Equipment BTC Radio EquipmentAnn Arbor, Michigan, USAActual1998UnknownSystem1998$1,360.00View Details
Basic Facilities, Comm. for Medium Area - TRRadio System Hardware Components Radio System Hardware ComponentsAnn Arbor, Michigan, USAActual1998System1998$15,000.00View Details
Transit Center HardwareAVL system hardware One computer system workstation and one backup station to support AVL route and schedule adherence (RSA). Dispatcher can view the location of AVL system vehicles on a map, in addition to displaying specific information about each vehicle (i.e,. vehicle ID, operator, route).United StatesEstimated20091System2009$20,000.00$2,000.00View Details
Transit Center HardwareAVL system hardware One computer system workstation and one backup station to support AVL route and schedule adherence (RSA). Dispatcher can view the location of AVL system vehicles on a map, in addition to displaying specific information about each vehicle (i.e,. vehicle ID, operator, route).United StatesEstimated20091System2009$46,000.00$4,600.00View Details
Transit Center HardwareCentral Dispatch ServerTransit Central Dispact Server operates on open-source EDAPTS software and stores opertations dataSan Luis Obispo, California, United StatesEstimated20081Each (EA)2007$1,700.00View Details
Transit Center HardwareCentral Dispatch WorkstationCentral Dispach Workstation for use of EDAPTS open-source software for bus scheduling, location, and other operations needs.San Luis Obispo, California, United StatesEstimated20082Each (EA)2007$700.00View Details
Transit Center HardwareCentral Recording Station Central Recording StationAnn Arbor, Michigan, USAActual1998SystemSystem1998$10,000.00View Details
Transit Center HardwareTransit Center HardwareParatransit services DSU/CSU and router for CDPD communications.Fitchburg, Massachusetts, USAActual2002Lump Sum (LS)2002$7,500.007View Details
Transit Center HardwareTransit Center HardwareIncludes three dispatch consoles, 10 customer service workstations and an annunciation recording workstation.Tampa, Florida, USAEstimated2006Lump Sum (LS)2006$94,000.0010View Details
Transit Center HardwareTransit Center HardwareThree Dell Precision 470 workstations. Includes standard office software and monitors. O&M is estimated at 2% of capital cost.General USA Data, USAActual2006Lump Sum (LS)2006$9,000.00$180.00View Details
Transit Center HardwareTransit Center HardwareThree Dell Precision 470 workstations. Includes standard office software and monitors. O&M is estimated at 2% of capital cost.General USA Data, USAActual2006Lump Sum (LS)2006$12,000.00$240.00View Details
Transit Center HardwareTransit Center HardwareTransit Center Hardware for ICMSan Francisco, California, United StatesEstimated2008System2008$22,500.0010View Details
Transit Center HardwareWork station licenses Work station licensesAnn Arbor, Michigan, USAActual1998System1998$36,500.00View Details
Transit Center Software, IntegrationAVL system software integrated with schedulingAVL route and schedule adherence (RSA) software at transit management center that determines if a bus is running behind or ahead of schedule. The driver can be notified via the moblile data terminal (MDT) to adjust the stop dwell time or layover time or increase the speed to get back on schedule.United StatesEstimated20091System2009$230,000.00$23,000.00View Details
Transit Center Software, IntegrationMDT – Bus in a box MDT – Bus in a boxAnn Arbor, Michigan, USAActual1998UnknownSystem1998$5,398.00View Details
Transit Center Software, IntegrationRural Transit APTS Advanced Travel Planner/Web Site DevelopmentRural Transit APTS ATP/Web Site DevelopmentCape Cod, Massachusetts, USAActual2001System2001$11,625.00View Details
Transit Center Software, IntegrationRural Transit APTS Software upgrades/evaluationRural Transit APTS Software upgrades/evaluationCape Cod, Massachusetts, USAActual2000System2000$61,606.00View Details
Transit Center Software, IntegrationTransit Center Software for Tracking and SchedulingCapital costs include in-vehicle software and middleware licenses for 15 vehicles and control center software. O&M costs reflect annual software warranty for both in vehicle and control center software.Fitchburg, Massachusetts, USAActual2002Lump Sum (LS)2002$46,200.00$6,000.007View Details
Transit Center Software, IntegrationTransit Center Software, IntegrationTransit. vehicle tracking and scheduling; database and information storage; schedule adjustment software; real-time travel information software; and integration. The software is COTS technology and the unit price does not reflect product development.Florida, USAEstimated2003System2003$350,000.00View Details
Transit Center Software, IntegrationTransit Center Software, IntegrationSoftware is primarily COTS. Vendor Trapeze modules: FX-MON, PASS-MON, PLAN-MON.Tampa, Florida, USAEstimated2006Lump Sum (LS)2006$725,000.0010View Details
Transit Center Software, IntegrationTransit Center Software, IntegrationTransit center software, integration.Chattanooga, Tennessee, USAActual2005Lump Sum (LS)2005$172,269.0010View Details
Transit Center Software, IntegrationTransit Center Software/IntegrationTransit Center Software/Integration with TMC system for ICMSan Francisco, California, United StatesEstimated2008System2008$815,000.00$9,000.0020View Details
Transit Center LaborSmart Parking LaborMonthly Labor costs for operating Smart Parking system at a BART station field testSan Francisco, California, United StatesEstimated2004per month2004$16,287.50View Details
Transit Center LaborTransit Center LaborLabor for MDT/AVL system implementation for paratransit services.Fitchburg, Massachusetts, USAActual2002Per Year2002$54,600.00View Details
Transit Center LaborTransit Center LaborTransit Center Labor for ICMSan Francisco, California, United StatesEstimated2008Per Year2008$150,000.00View Details
Upgrade for Auto. Scheduling, Run Cutting, or Fare PaymentTrapeze Software Trapeze SoftwareAnn Arbor, Michigan, USAActual1998SystemSystem1998$261,099.00View Details
Upgrade for Auto. Scheduling, Run Cutting, or Fare PaymentUpgrade for Auto. Scheduling, Run Cutting, or Fare PaymentCOTS Software.Chattanooga, Tennessee, USAActual2005Lump Sum (LS)2005$177,382.0010View Details
Integration for Auto. Scheduling, Run Cutting, or Fare PaymentAutomated transit scheduling and dispatch systemAutomated fixed-route scheduling software application and hardware for route planning and restructuring and run-cutting. Enables agencies to produce efficient vehicle and operator/crew schedules. Interfaces with CAD/AVL systems.United StatesEstimated20091System2009$150,000.00$14,400.00View Details
Integration for Auto. Scheduling, Run Cutting, or Fare PaymentAutomated transit scheduling and dispatch systemAutomated fixed-route scheduling software application and hardware for route planning and restructuring and run-cutting. Enables agencies to produce efficient vehicle and operator/crew schedules. Interfaces with CAD/AVL systems.United StatesEstimated20091System2009$360,000.00$35,400.00View Details
Vehicle Location Interface - TRTransit AVL InterfaceVehicle location interfaceUnited StatesEstimated2009System2009$25,000.00$2,500.00View Details
Vehicle Location Interface - TRTransit Center Vehicle Location InterfaceMDT/AVL System Implementation for Paratransit Services. O&M costs reflect estimated annual costs for CDPD airtime to communicate with 15 equipped vehicles plus dedicated telco lines.Fitchburg, Massachusetts, USAEstimated2002Lump Sum (LS)2002$11,000.00$5,400.007View Details
Video Monitors for Security System TMC work station equipment for video surveillanceTransit management center equipment required to monitor public areas inside and around transit vehicles.United StatesEstimated2009System2009$10,000.00$400.00View Details
Video Monitors for Security System TMC work station equipment for video surveillanceTransit management center equipment required to monitor public areas inside and around transit vehicles.United StatesEstimated2009System2009$15,000.00$600.00View Details
Hardware for Security SystemHardware for Security SystemIncludes 1 server and 2 workstations, incl installation.Tampa, Florida, USAEstimated2006Each (EA)2006$9,700.0010View Details
Hardware for Security SystemHardware for Security SystemOne Dell Power Edge SC-430 server and three Dell Precision 470 workstations. Includes standard office software and monitors. O&M is estimated at 2% of capital cost.General USA Data, USAActual2006Lump Sum (LS)2006$15,000.00$300.00View Details
Hardware for Security SystemHardware for Security SystemOne Dell Power Edge SC-430 server and three Dell Precision 470 workstations. O&M is estimated at 2% of capital cost.General USA Data, USAActual2006Lump Sum (LS)2006$22,000.00$440.00View Details
Hardware for Security SystemVideo Surveillance System Video Surveillance SystemAnn Arbor, Michigan, USAActual1998SystemSystem1998$123,774.00View Details
Human Service Transportation Coordination - System MaintenanceDemand Response Software UpgradeCost for upgrade to a Demand Response Software system, including operating system for a paratransit providerAustin, Texas, United StatesEstimatedSystem2003$100,000.00$10,000.00View Details
Human Service Transportation Coordination - System MaintenanceHuman Service Transportation Coordination System MaintenanceHuman Service Transportation Coordination System Maintenance - Annual Help Desk support for system data or program issues and/or user updates and training issues, as well as the support options such as email, fax, on-line chat, or phone. - Smart Card hardware support for troubleshooting and maintain the smart card equipment. - User updates - Server maintenance for web site monitoring, system backups, troubleshooting and documentation updates, limited software modifications, and IT support and project management. Maintenance includes 208 vehicles within 14 agencies.New Mexico, USAEstimated20051Per Year2005$60,000.00View Details
Human Service Transportation Coordination - System MaintenanceMaintenance/Tech ServicesMaintenance/Tech ServicesNew Mexico, USAEstimated2004Per Year2004$35,000.00View Details
Human Service Transportation Coordination System - Help DeskHelp Desk/Support Help Desk/Support - One FTE for 3 months, ½ FTE for 3 months, 2-3 hours per day continuedNew Mexico, USAEstimated2004per yearSystem2004$20,000.00View Details
Human Service Transportation Coordination System - ServerServer HostingServer HostingNew Mexico, USAEstimated2004Per Year2004$2,000.00View Details
Human Service Transportation Coordination System - Software DevelopmentDemand Response SoftwareCost for intitial implementation of a Demand Response Software system for a paratransit providerAustin, Texas, United StatesEstimatedSystem1994$60,000.00View Details
Human Service Transportation Coordination System - Software DevelopmentSoftware Development ToolsSoftware Development ToolsNew Mexico, USAActual2004Lump Sum (LS)2004$2,500.00View Details
Human Service Transportation Coordination System - Software DevelopmentTransit Software DevelopmentCost to develop, test and deploy a coordinated reservation and tracking system for New Mexico's DHS, DOT, and PTPBStatewide, New Mexico, United StatesActual2003System2003$155,000.00View Details
Human Service Transportation Coordination System - TrainingTraining Updates - Materials and TrainerTraining Updates - Materials and TrainerNew Mexico, USAEstimated2004per yearSystem2004$20,000.00View Details
Integration for Transit Fleet MaintenanceIntegration for Paratransit Fleet MaintenanceCapital Costs to integrate Control Center with Scheduling System includes software development. O&M reflects continued upgrade and maintenance of Scheduling System.Fitchburg, Massachusetts, USAActual2003Lump Sum (LS)2003$15,000.00$15,000.007View Details
Local Area Network - TRRural Transit APTS Local area networkRural Transit APTS Local area networkCape Cod, Massachusetts, USAActual2000System2000$117,920.00$34,838.00View Details
Smart Card Reader - TRDesk Top Reader for Transit Agencies Desk Top Reader for Transit AgenciesNew Mexico, USAActual200427Each (EA)2004$212.00View Details
Smart Card Reader - TRElectronic Card Fare Payment SystemEstimated cost of procuring an electronic card fare system that includes cards for drivers and clients, 200 on board readers and software interfaceStatewide, New Mexico, United StatesEstimated2003System2003$550,000.00View Details
Transit Real Time Information System UpgradeTransit AVL system for traveler informationTransit traveler Information system that includes fixed-end equipment and interface to the transit AVL system.United StatesEstimated2009System2009$130,000.00$5,700.00View Details
Transit Real Time Information System UpgradeTransit AVL system for traveler informationTransit traveler Information system that includes fixed-end equipment and interface to the transit AVL system.United StatesEstimated2009System2009$195,000.00$18,900.00View Details
Transit Real Time Information System UpgradeTransit Real Time Information System Servers & Software Transit Real Time Information System Servers & SoftwarePortland, Oregon, USAActual2003System2003$125,000.005View Details
Voice and Data CommunicationsBus Radio ServiceCost for a single radio channel for bus radio communicationsSan Luis Obispo, California, United StatesEstimated200818per month2007$17.00View Details
Voice and Data CommunicationsPager serviceMonthy cost for the pager service that updates the Smart Transit SignsSan Luis Obispo, California, United StatesEstimated20081per month2007$55.00View Details
Voice and Data CommunicationsVoice and Data CommunicationsCommunications includes communications equipment internal to the facility such as equipment racks, multiplexers, comms tower, modems, etc.Tampa, Florida, USAEstimated2006Lump Sum (LS)2006$648,000.0010View Details
Voice Annunciator Central SystemVoice Annunciator Central SystemIncludes initial audio, visual messages and network installation.Tampa, Florida, USAEstimated2006Lump Sum (LS)2006$234,000.0010View Details