Equipment
Labor for Signal Control
UNID
DB9C01FCB8696DBA85256F1F00618E67
IDAS Number
TM002
Sort Number
0
Unadjusted High O&M Cost
594.00
Unadjusted Low O&M Cost
486.00
Unadjusted O&M Cost Date
Adjusted Low O&M Cost
798.22
Adjusted High O&M Cost
975.60
Adjusted O&M Cost Date
Sort
106.00
Unadjusted Notes

Costs include labor for operations (two @ 50% of the time, at $100K), transportation engineer (one at 50% of the time, at $100K), update timing plans ($2K per system per month for every 10 systems), and signal maintenance technician (two @ 75K). Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc.

Adjusted Notes

Costs include labor for operations (two @ 50% of the time, at $100K), transportation engineer (one at 50% of the time, at $100K), update timing plans ($2K per system per month for every 10 systems), and signal maintenance technician (two @ 75K). Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc.

Sample Unit Cost