Skip to Content Skip to Search U.S. Department of Transportation (US DOT) Logo Research and Innovative Technology Administration (RITA) Logo Intelligent Transportation Systems Research and Innovative Technology Administration (RITA)
 

 

Need assistance? Contact us or view the Help page.
Quick Links: Applications Overview icon Benefits Database icon Costs Database icon Deployment Statistics icon Lessons Learned icon
in   Search Help

 

Application Area Icon for Commercial Vehicle OperationsCommercial Vehicle Operations (13 unique system cost summaries found)

Credentials Administration
Electronic Funds

TMC central hardware costs can exceed $200,000 if regional communications and system integration are required.(5 August 2004)

Total project cost for electronic credentialing system in New York state was $577,910.(September 2001)

Electronic Registration/Permitting

Startup costs were $275 and annual recurring costs were $125 for 38 companies enrolled in electronic credentialing(2 October 2007)

Startup costs were $275 and annual recurring costs were $125 for 38 companies enrolled in electronic credentialing(2 October 2007)

TMC central hardware costs can exceed $200,000 if regional communications and system integration are required.(5 August 2004)

Based on data from Maryland and Kentucky, the costs to deploy a CVISN electronic credentialing system ranges from $464,802 to $935,906.(March 2002)

Total project cost for electronic credentialing system in New York state was $577,910.(September 2001)

Safety Assurance
Safety Information Exchange

The annualized life-cycle costs for full ITS deployment and operations in Tucson were estimated at $72.1 million. (May 2005)

A modeling study evaluated the potential deployment of full ITS capabilities in Cincinnati. The annualized life-cycle cost was estimated at $98.2 million.(May 2005)

The annualized life-cycle costs for full ITS deployment and operations in Seattle were estimated at $132.1 million.(May 2005)

TMC central hardware costs can exceed $200,000 if regional communications and system integration are required.(5 August 2004)

Using data from Kentucky and Connecticut, statewide deployment of the safety information exchange system cost approximately $650,000. (March 2002)

Electronic Screening
Credential Checking

The annualized life-cycle costs for full ITS deployment and operations in Tucson were estimated at $72.1 million. (May 2005)

A modeling study evaluated the potential deployment of full ITS capabilities in Cincinnati. The annualized life-cycle cost was estimated at $98.2 million.(May 2005)

The annualized life-cycle costs for full ITS deployment and operations in Seattle were estimated at $132.1 million.(May 2005)

TMC central hardware costs can exceed $200,000 if regional communications and system integration are required.(5 August 2004)

Using data from Kentucky and Connecticut, the initial deployment of full CVISN electronic screening at a static scale site is $522,252. The cost of upgrading each additional site to full CVISN electronic screening is $303,540.(March 2002)

Safety Screening

Recurrent costs for electronic screening ranged from $7 to $14 per transponder per month.(2 October 2007)

Weight Screening

The annualized life-cycle costs for full ITS deployment and operations in Tucson were estimated at $72.1 million. (May 2005)

A modeling study evaluated the potential deployment of full ITS capabilities in Cincinnati. The annualized life-cycle cost was estimated at $98.2 million.(May 2005)

The annualized life-cycle costs for full ITS deployment and operations in Seattle were estimated at $132.1 million.(May 2005)

Using data from Kentucky and Connecticut, the initial deployment of full CVISN electronic screening at a static scale site is $522,252. The cost of upgrading each additional site to full CVISN electronic screening is $303,540.(March 2002)

Weigh station electronic screening systems can be deployed with basic ($150,000) or advanced functions ($780,000).(8-12 November 1999)

Carrier Operations & Fleet Management
Automatic Vehicle Location / Computer-Aided Dispatch

Commercially available, off-the-shelf technology that enhances the safety and security of hazmat transportation operations ranges in cost from $250 to $3,500 per vehicle.(31 August 2004)

Cost of remote asset tracking device begins at approximately $800 per trailer.(22 June 2000)

On-Board Monitoring

Commercially available, off-the-shelf technology that enhances the safety and security of hazmat transportation operations ranges in cost from $250 to $3,500 per vehicle.(31 August 2004)

Security Operations
Asset Tracking

Commercially available, off-the-shelf technology that enhances the safety and security of hazmat transportation operations ranges in cost from $250 to $3,500 per vehicle.(31 August 2004)

Cost of remote asset tracking device begins at approximately $800 per trailer.(22 June 2000)

Remote Disabling Systems

Commercially available, off-the-shelf technology that enhances the safety and security of hazmat transportation operations ranges in cost from $250 to $3,500 per vehicle.(31 August 2004)