Equipment Costs for Toll Plaza (TP)
Note: The date in parentheses under the capital cost value and O&M cost value represents the dollar year of the cost values. All costs are in $K.
| Unit Cost Element |
IDAS # |
Life Years |
Capital Cost $K (Source Year) |
O&M Cost $K/year (Source Year) |
Description |
| Electronic Toll Reader | TP001 | 10 | 2.0 - 5.0 (2001) | 0.2 - 0.5 (2001) | Readers (per lane). O&M is estimated at 10% of capital cost. |
| High-Speed Camera | TP002 | 10 | 7.0 - 10.0 (2003) | 0.5 - 1.0 (1995) | Cost includes one camera per two lanes. |
| Electronic Toll Collection Software | TP003 | 10 | 5.0 - 10.0 (1995) |  | Includes COTS software and database. |
| Electronic Toll Collection Structure | TP004 | 20 | 10.0 - 15.0 (1995) |  | Mainline structure. |