Skip to Content Skip to Search U.S. Department of Transportation (US DOT) Logo Research and Innovative Technology Administration (RITA) Logo Intelligent Transportation Systems Research and Innovative Technology Administration (RITA)
 

 

Need assistance? Contact us or view the Help page.
Quick Links: Applications Overview icon Benefits Database icon Costs Database icon Deployment Statistics icon Lessons Learned icon
in   Search Help

 

Unit Costs (Adjusted) (View Unadjusted)

Equipment Costs for Transit Vehicle On-Board (TV)

Note: Equipment list adjusted to 2008 dollars. The date in parentheses under the capital cost value and O&M cost value represents the dollar year from which the cost value was adjusted. All costs are in $K.

Unit Cost Element IDAS # Life
Years
Capital Cost
$K, 2008 Dollars
(Source Year)
O&M Cost
$K/year, Dollars
(Source Year)
Description
Driver Interface and Schedule Processor
Index: 2
TV001100.2 - 0.3
(1995)
0.004 - 0.010
(1995)
On-board schedule processor and database.
Cell Based Communication Equipment
Index: 1
TV002100.14 - 0.23
(1995)
0.007 - 0.012
(1995)
Cell-based radio with data capacity.
GPS/DGPS for Vehicle Location
Index: 2
TV003100.4 - 2.0
(2002)
0.010 - 0.033
(2002)
AVL GPS/DGPS. Capital cost depends on features of unit. O&M cost (estimated at 2% of capital) is for unit maintenance and does not include annual telecom service fees.
Signal Preemption Processor
Index: 2
TV004100.2 - 0.4
(1995)
0.004 - 0.007
(1995)
On-board schedule processor and database. Complement to IDAS elements RS004 and RS005.
Signal Preemption/Priority Emitter
Index: 2
100.4 - 1.9
(2005)
0.1
(2005)
Data-encoded emitter; manually initiated. Complement to Roadside Signal Preemption/Priority (see Roadside Control subsystem). Estimated O&M.
Preemption/Priority Transponder
Index: 2
0.06
(2000)
Passive transponder mounted on underside of transit vehicle. Requires transit priority system at the Transit Management Center.
Trip Computer and Processor
Index: 2
TV005100.10 - 0.10
(1995)
0.001 - 0.002
(1995)
On-board processor for trip reporting and data storage.
Security Package
Index: 2
TV006102.8 - 5.0
(2005)
0.14 - 0.20
(1995)
On-board CCTV surveillance camera and hot button. The high capital cost represents a common installation of a digital event recorder system.
Electronic Farebox
Index: 2
TV007100.5 - 1.1
(1995)
0.03 - 0.05
(1995)
On-board flex fare system DBX processor, on-board farebox, and smart card reader.
Automatic Passenger Counting System
Index: 2
100.85 - 8.50
(2005)
Low cost reflects the APC system as an add-on to an existing route scheduling or tracking system. High cost reflects the APC system as a stand alone installation. Cost is per vehicle and includes installation.