Unit Cost Component
Description

1.25 inch conduit. Includes directional drilling at $13 per linear foot.

Capital Cost Per Unit
$18.25
Adjusted Capital Cost Per Unit
$21.17
Unit Cost Type
Unit
Linear Foot (LF)
CPI ID
1
CPI Name

WPU1176

Year
2006
Notes
Cost figures derived from 2006 NC DOT bid averages.