Content references source material no longer available at its original location.
Cost Subsystem
Unit Cost Element
Unit Cost Component
Description

High Estimate. the ramp meter assembly/signal display, the controller, wiring, and MOT.

Capital Cost Per Unit
$64,000.00
Adjusted Capital Cost Per Unit
$46,630.40
Unit Cost Type
Unit
Each (EA)
CPI ID
2
CPI Name

WPU1178

Year
2003
Notes
Arizona Estimation Study