Cost Subsystem
Unit Cost Element
Unit Cost Component
Description
Total Installation Cost (Trawick Construction = $333,339.31), (Duke Power = $11,699.38), (BellSouth = $6,711.03), (CSX Wireline Fee = $14,350).
Capital Cost Per Unit
$366,099.00
Adjusted Capital Cost Per Unit
$427,530.41
Lifetime
30
Unit Cost Type
Unit
Lump Sum (LS)
CPI ID
1
CPI Name
WPU1176
Year
2004