Tarry, Steve and Martin Pyne. UK-M8 Motorway Ramp Metering (TABASCO Project). European Commission Directorate General Energy and Transportation, TEMPO Secretariat, (Document No.…
The evaluation project considered the impacts of TUC on the entire urban network as well as areas in and around the deployment area. The study area included 44 links. Thirty-nine (39) of these were…
The evaluation project considered the impacts of TUC on the entire urban network as well as areas in and around the deployment area. The study area included 44 links. Thirty-nine (39) of these were…
The evaluation project considered the impacts of TUC on the entire urban network as well as areas in and around the deployment area. The evaluation was completed in March of 1998.SURVEY RESULTSThree…
The evaluation project considered the impacts of TUC on the entire urban network as well as areas in and around the deployment area. The evaluation was completed in March of 1998.SURVEY RESULTSThree…
RESULTS
In the area of network and traffic management, the results of a ramp-metering trial (TABASCO project, in Glasgow Scotland) indicated that 59 percent of the drivers found ramp-metering very…