FINDINGS
During a 6-month period, the client list grew from 1,000 to 2,000 and vehicle miles per passenger-trip grew five percent. At the same time, operating expenses dropped two percent per…
FINDINGSDuring a 6-month period, the client list grew from 1,000 to 2,000 and vehicle miles per passenger-trip grew five percent. At the same time, operating expenses dropped two percent per…
FINDINGSIn Kansas City, AVL reduced scheduled running times and generated an estimated operations and maintenance cost savings of $400,000 annually.In New Jersey, automated fare collection increased…
In 2004, the North Carolina Department of Transportation (NCDOT) designed an ITS work zone solution on a rural section of I-40 west of Winston Salem. The goal of the system was to monitor traffic…
In 2004, the North Carolina Department of Transportation (NCDOT) designed an ITS work zone solution on a rural section of I-40 west of Winston Salem. The goal of the system was to monitor traffic…